Find local bathroom renovation experts in Central Coast
Fill in a short form and get free quotes for professional bathroom renovation services in Central Coast
Excellent rating - 4.3/5 (10900+ reviews)
Need help with bathroom renovation?
- Quote and planning
- Demolishing your old bathroom
- Prep for new bathroom
- Adding your new fixtures
- Final inspection and clean
- … or anything else
Best rated bathroom renovators near me
What is Airtasker?
Post your task
Tell us what you need, it's FREE to post.
Review offers
Get offers from trusted Taskers and view profiles.
Get it done
Choose the right person for your task and get it done.
- Get it done now. Pay later.
- Repay in 4 fortnightly instalments
- No interest
- Available on payments up to $1,500
What does a bathroom renovation include?
Experienced handymen, plumbers, and builders can help with small cosmetic changes to your bathroom. They’ll replace showerheads, taps, fit a shower screen door, or even plumb your toilet. But if you’re looking for a complete bathroom overhaul, you need a bathroom renovation specialist. Here’s what you can expect when working with bathroom renovation contractors and tradies:
Step 1. Quote and planning
Your bathroom renovator will normally need to visit your property to create an accurate quote. They’ll base their costings on the size of your bathroom, how long the project will take (usually 13-25 days for a whole bathroom renovation), and materials needed. You’re responsible for choosing and ordering any new fixtures and fittings - bath, toilet, units, tiles, etc. These should be paid for and delivered before the building start date. Your contractor will sent through the quote and draw up a blueprint for all tradespeople to work from, to ensure the project is kept on track.
Step 2. Demolishing your old bathroom
Builders and demolition professionals will strip out your old bathroom and knock through any walls. They’ll remove fixtures and either bin them, put them into storage, or cover them up so they’re protected during building work.
Step 3. Prep for new bathroom
Next, your plumber and electrician will carry out a rough-in fit. This means putting plumbing and electrical wiring in place without connecting it. Next, your carpenter, plasterer, and tiler will build or prepare your walls and floor for decorating. This can take 2-5 days depending on the size of your bathroom and drying time needed for plastering, rendering, and your undercoat of paint. Â Â
Step 4. Adding your new fixtures
Here you’ll really see your new bathroom come to life. First, your tiler will lay tiles and your painter will paint the walls. Once these are dry, your new bathroom furniture can be moved in. Your plumber and electrician now complete any connections. Your contractors will apply waterproofing and sealant around sinks, showers, and bathtubs. Finally, glass fixtures, like mirrors or shower doors, are installed.
Step 5. Final inspection and clean
With everything installed and dry, your bathroom renovator will carry out a final inspection. They’ll clear away and dispose of any bits leftover by the tradies. Your contractor might complete a basic clean, but you might also want to book a renovation cleaning service so your new bathroom is absolutely spick and span.
Recent Bathroom Renovation tasks in Central Coast
Need a tiler for a bathroom Reno
$2,000
Point Frederick NSW, Australia
14th May 2024
Need a bathroom tiling approximately 5sqm also need it waterproofed with a certificate to give to strata. Old bathroom is being taken out
Bathroom renovation 💪💪💪
$2,500
Patonga NSW, Australia
23rd Mar 2024
I’m looking for a licensed, reliable and meticulous plumber / tradie / builder who can help with a bathroom renovation. The current bathroom is getting wet, so we need to strip it out, waterproof and re-tile. We want to replace the toilet with a bath and move the toilet where there is currently a shower. The bathroom is approximately 6sqm (floor size). The walls are probably 3m high, so maybe 18sqm total. We have the bath, tiles and can buy the toilet, shower and fittings. We would also remove the current tiles.
Bathroom Renovation
$8,000
Tascott NSW, Australia
3rd Mar 2024
Bathroom and toilet renovation. Will provide tiles, shower, sink, toilet, and bathtub. Require lights installation.
Bathroom renovation quotes
$1,000
Niagara Park NSW, Australia
12th Dec 2023
We are seeking quotes to get our en suite bathroom and prospectively our main bathroom renovated. We will need new vanities and toilets. We are happy to keep the tiles consistent in both bathrooms. Getting both spaces completed will be very much depending on the quotation we receive. The en suite being priority. We bought this house in July 2023 and the old owners tiled over tile, the grout coming away. We are currently not using this bathroom to ensure there is no water leakage/damage. Please contact us and provide a quote for both the en suite and, the en suite and the main bathroom. The en suite is the brown and white and the main bathroom is blue. Budget specified in task is irrelevant. Thank you. - Due date: Flexible
Kitchen + bathroom renovation (certified builders only)
$9,999
Berkeley Vale NSW, Australia
5th Nov 2023
Hello! Looking for a certified builder. House open to view Friday 3 november at 12.00 only. Videos of kitchen and bathroom in current state can be shared via email Please find the draft future plan for the bathroom below. The old bathroom needs to be removed. Tiles should be up to between 1 - 1.5 m depending on the size of the tiles. There will be tiles on the floor in the shower + a L-shaped showerscreen with sliding door. Tiles 2.1 m high in the shower. Kitchen, draft future plan + video of current state and some pics attached. Kitchen needs to be removed. Please be mindful of the built in wardrobe in the left corner. We would like to have an acrylic backsplash behind the cooktop and the sink. I am looking for a quote for both rooms seperately + 1 for it together. All works needs to be done so plumbing, electricity and removal of current needs to be included in the quote. we'll need a shower shelve in the shower room (not built into the wall but attached) Please let me know cost involved, how long it will take and if you are available to start from Tuesday the 21st of November. Our end goal is to be finished by Friday the 22nd of December. Best, Martijn - Due date: Flexible
Bathroom renovation
$5,000
Lake Haven NSW 2263, Australia
17th Feb 2023
Small Bathroom Looking at someone to renovate New tiles , vanity , bath/shower etc - Due date: Flexible
Install Bathroom Fixtures & Stain Kitchen Bench
$450
Woy Woy Bay NSW 2256, Australia
10th Jan 2023
We have recently delivered a Tiny Home to a property in Pearl Beach and unfortunately due to the last minute rush before Christmas we missed a few details. We are located in Brisbane so we need a handyman to purchase a few fixtures from Bunnings (listed below) and head out to our clients property to install the fixtures, install a Velux Skylight blind and apply one more coat of stain to the Kitchen Benchtop. Fixtures: https://www.bunnings.com.au/barelli-piazza-matte-black-single-towel-ring_p0108327 - install below the power point on the right side of vanity https://www.bunnings.com.au/barelli-600mm-matte-black-ambiente-double-towel-rail_p0108344 - install up high on the wall to the right of the toilet https://www.bunnings.com.au/barelli-piazza-matte-black-toilet-roll-holder_p0108323 - install at appropriate height beside toilet on right side wall The stain to purchase is the colour Merbau and 250ml will be more than enough, see below: https://www.bunnings.com.au/cabot-s-250ml-merbau-water-based-deck-and-exterior-timber-stain_p1520407 Please mask around the window jam, tile splashback, cabinets, cooktop and sink. Please add this to the Bunnings purchase and a suitable brush. Total cost of Bunnings items is approximately $110. There will also be a Velux Skylight blind onsite that will need to be installed. Please see below video tutorial: https://www.youtube.com/watch?v=O3TSqSgAEFs Overall, we expect all of these odd-jobs to take 3 or so hours. Happy to pay $400 total to cover the Bunnings purchases and your time. - Due date: Flexible - Due date: Flexible
Finish off bathroom reno
$4,000
Tumbi Umbi NSW, Australia
17th Dec 2022
Small bathroom 1.5 x 2.3 needs floor screen, floor tiled, bath, toilet and vanity installed. Unfinished job. - Due date: Before Friday, 23 December 2022
Bathroom renovation
$10
Wyongah NSW, Australia
6th Feb 2022
Hi Need a complete bathroom reno done. I will supply Tiles Toilet Vanity Tiles Tapware etc Please contact to view and quote - Due date: Flexible
New Kitchen/bathroom Renovation
$8,000
Wyong NSW, Australia
26th Oct 2021
Hi, I have a gallery kitchen that would need new doors and bench tops. A mini renovation. Would like to get a quote on clean light look as per attached. Purpose is to sell, so don’t want a cheap renovation but in the middle. Tenant moves out next week. I would be after a quote for the bathroom for his/hers bathroom with the same bench top used and cabinetery to save cost and for consistency.
Bathroom renovations
$1,000
Wyoming NSW 2250, Australia
29th May 2021
Removing the wall between toilet area and bathroom to be merged. Installing new tiles, bath, hower and vanity. Total area: 2.6m x 2.6m. I will provide tiles, bath, shower, and vanity.
I need bathroom renovation services
$250
Booker Bay NSW 2257, Australia
11th May 2021
We cannot afford to renovate our bathroom, but would like to have some work done on shower recess. Looking grubby and needs freshening up.Needs Regrouting and silicone around bath and shower looking mouldy. Help please. Wendy Gourlay