A white van parked on a street, with a person standing next to it, ready to load or unload items.
A white van parked on a street, with a person standing next to it, ready to load or unload items.

Find local bathroom renovation experts in Mornington Peninsula

Fill in a short form and get free quotes for professional bathroom renovation services in Mornington Peninsula

4.3

Excellent rating - 4.3/5 (10900+ reviews)

Need help with bathroom renovation?

  • Quote and planning
  • Demolishing your old bathroom
  • Prep for new bathroom
  • Adding your new fixtures
  • Final inspection and clean
  • … or anything else
It only takes 2 minutes. And it's free.
Up to 50% cheaper than franchise dealers
No job too big or small
Free insurance coverage
Secure cashless payments
Same day or next day service at no extra cost

Best rated bathroom renovators near me

Recent Bathroom Renovation reviews in Mornington Peninsula

Excellent communication , job done perfectly and in super quick time - highly recommend

Plumber bathroom renovation

$950

The best performance I will using again

Bathroom Reno

$5

Great doing business with.

Bathroom Renovation

$40

Great communicator, clear he knows what he’s doing and suggested what would be best as well as working with us closely.

Plastering - Bathroom Reno

$600

Average reviews for Bathroom Renovation Services in Mornington Peninsula

based on 4 reviews

5

4
0
0
0
0

What is Airtasker?

Post your task

Post your task

Tell us what you need, it's FREE to post.

Review offers

Review offers

Get offers from trusted Taskers and view profiles.

Get it done

Get it done

Choose the right person for your task and get it done.

Now Available
  • Get it done now. Pay later.
  • Repay in 4 fortnightly instalments
  • No interest
  • Available on payments up to $1,500

What does a bathroom renovation include?

Experienced handymen, plumbers, and builders can help with small cosmetic changes to your bathroom. They’ll replace showerheads, taps, fit a shower screen door, or even plumb your toilet. But if you’re looking for a complete bathroom overhaul, you need a bathroom renovation specialist. Here’s what you can expect when working with bathroom renovation contractors and tradies:

Step 1. Quote and planning

Your bathroom renovator will normally need to visit your property to create an accurate quote. They’ll base their costings on the size of your bathroom, how long the project will take (usually 13-25 days for a whole bathroom renovation), and materials needed. You’re responsible for choosing and ordering any new fixtures and fittings - bath, toilet, units, tiles, etc. These should be paid for and delivered before the building start date. Your contractor will sent through the quote and draw up a blueprint for all tradespeople to work from, to ensure the project is kept on track.

Step 2. Demolishing your old bathroom

Builders and demolition professionals will strip out your old bathroom and knock through any walls. They’ll remove fixtures and either bin them, put them into storage, or cover them up so they’re protected during building work.

Step 3. Prep for new bathroom

Next, your plumber and electrician will carry out a rough-in fit. This means putting plumbing and electrical wiring in place without connecting it. Next, your carpenter, plasterer, and tiler will build or prepare your walls and floor for decorating. This can take 2-5 days depending on the size of your bathroom and drying time needed for plastering, rendering, and your undercoat of paint.   

Step 4. Adding your new fixtures

Here you’ll really see your new bathroom come to life. First, your tiler will lay tiles and your painter will paint the walls. Once these are dry, your new bathroom furniture can be moved in. Your plumber and electrician now complete any connections. Your contractors will apply waterproofing and sealant around sinks, showers, and bathtubs. Finally, glass fixtures, like mirrors or shower doors, are installed.

Step 5. Final inspection and clean

With everything installed and dry, your bathroom renovator will carry out a final inspection. They’ll clear away and dispose of any bits leftover by the tradies. Your contractor might complete a basic clean, but you might also want to book a renovation cleaning service so your new bathroom is absolutely spick and span.

Recent Bathroom Renovation tasks in Mornington Peninsula

Bathroom Renovation

$5,000

Carrum Downs VIC, Australia

31st Aug 2024

Small Ensuite Renovation Approx measurements 3.2 x 1.5m -Demo existing floor to ceiling tiled bathroom -Disconnect all plumbing (toilet, sink tap, shower system etc). Change shower plumbing from rain head and hand held shower system with diverter and mixer to mixer and 2 in 1 twin shower system. -Replaster, accounting for 2 x niches. Cornices used however may consider square set look if tile can be brought to the ceiling) -screed, waterproof, tile, grout, caulk etc. Note: floor to ceiling tiles (likely 300 x 600 tiles) -install vanity and mirrored cabinet -reconnect plumbing and install new tapware to include sink mixer tap, toilet, twin 2 in 1 shower system, shower mixer -rubbish removal We will provide the following: Tiles, tapware / shower system, vanity and mirrored cabinet, toilet Airtasker to provide all other tiling materials (edging, grout, caulk etc), plastering materials etc. I am pedantic - please only confident bathroom renovates provide quotes, I can spot a chipped tile a mile away! Electrician not required. Location: Carrum Downs Start Date: Flexible

Bathroom Reno

$5

Seaford VIC, Australia

28th May 2024

We need to replacement the shower base and bathtub thanks

The best performance I will using again

Finish a bathroom renovation

$3,500

Rosebud VIC, Australia

26th Mar 2024

Levelling the concrete floor. Waterproofing the walls behind the shower Installing the acrylic shower wall and the shower screen Replacing the architraves and window surrounds Installing the bath tub and vanity unit

Plastering - Bathroom Reno

$600

Frankston North VIC, Australia

1st Dec 2023

Doing a small bathroom Reno just need 4 sheets of plaster hung (2400x1200) and stopped up. Sheets and plaster glue on site ready to go - Due date: Needs to be done on Monday, 4 December 2023

Great communicator, clear he knows what he’s doing and suggested what would be best as well as working with us closely.

Plumber bathroom renovation

$950

Seaford VIC, Australia

19th Oct 2023

Need plumbing done run new drainage pipes and conceal in brick wall and also run new hot and cold lines install and connect bath taps and spout, shower taps and shower head and basin taps. Plumber to supply materials I will supply all taps shower head etc - Due date: Needs to be done on Thursday, 26 October 2023

Excellent communication , job done perfectly and in super quick time - highly recommend

Plumb bathroom renovation.

$1,100

Rye VIC, Australia

23rd Sep 2023

Request pdf for full scope. Relocate toilet, floorboards can be lifted up. Relocate shower taps and shower head, walls will be open for full access. Relocate vanity tap, Due date: Needs to be done on Wed 8 & Thu 9 Nov 2023

Bathroom renovation

$9,999

Carrum Downs VIC 3201, Australia

22nd Sep 2023

Plan and quote needed for a bathroom reno on a 30ish year old house. Small area, approx 1.7m x 2.5m. Quote would need to include demo, all new items, and rubbish removal. Painting not required as we can do that. May also be interested in new flooring throughout the house and kitchen cupboard doors. Please only contact if licenced tradesmen and past work can be verified (via Facebook, Instagram or online) - Due date: Flexible

Small 2 bedroom flat bathroom Reno

$2,000

Seaford VIC, Australia

13th Aug 2023

Bathroom renovation tiling installing bath tub shower and waterproofing. I will supply all materials labour only required - Due date: Before Friday, 8 September 2023

Bathroom renovation

$10

Mount Martha VIC 3934, Australia

25th Jul 2023

We are needing someone to renovate our bathroom. New tiles, shower, vanity etc - Due date: Flexible

Bathroom renovates

$5,000

Carrum Downs VIC 3201, Australia

16th Jun 2023

Ensuite bathroom shower base is cracked - Due date: Flexible

Bathroom Renovation

$2,000

Rye VIC, Australia

16th Mar 2023

Basic bathroom renovation. Tiling, new shower, bath and vanity. I’ll supply all products Dimensions 3560 x 2100 - Due date: Flexible

Quotation for bathroom renovation

$5

Seawinds Ward VIC, Australia

4th Dec 2022

Complete bathroom renovation (remove existing bath and replace with long shower; remove existing shower; reposition toilet and vanity). - Due date: Flexible

Bathroom renovation

$6,000

Seawinds Ward VIC, Australia

3rd Dec 2022

I would like to remove a bath and convert to a wide shower; remove existing shower and reconfigure location of toilet and vanity. - Due date: Flexible

Quote for bathroom renovation

$5

Seawinds Ward VIC, Australia

3rd Dec 2022

Removal of existing bath to convert to long shower, remove existing shower and reconfigure toilet and vanity. - Due date: Flexible

Tiling on floor and walls of bathroom renovation

$1,000

Mornington VIC 3931, Australia

17th Oct 2022

Wall and floor tiles of new bathroom - Due date: Before Friday, 28 October 2022

Bathroom Renovation

$10

Frankston VIC, Australia

13th Aug 2022

Bathroom Renovation. Remove all items including vanity, toilet, shower, tiles. Replace with all new items. We supply all materials and you provide labour. Room size Approx 1.8mx1.7m. Full tiles for shower and rest of the walls tile from floor to half of the wall. Photos will be supplied as requested - Due date: Flexible

Install sliding door in bathroom reno

$100

Karingal VIC 3199, Australia

14th Apr 2022

Instal Bunnings roller door into wall. The wall is already exposed from reno. - Due date: Needs to be done on Friday, 15 April 2022

Bathroom renovations

$45

Balnarring VIC, Australia

1st Feb 2022

Complete renovation of existing bathroom. Knock through toilet and bathroom wall to create one big bathroom. New bath, shower, etc and tiling to floor and some wall. Also renovate smaller shower/toilet room with new shower, toilet, vanity, etc, and tile. $45k budget - Due date: Flexible

Laundry/bathroom renovation add,change, extend.

$9,999

Highett VIC, Australia

14th Dec 2021

*extend shower wall and install cavity sliding door between kitchen and laundry area *convert bath to shower . *install smaller vanity to make more room * Make main toilet smaller Tiling etc throughout. May need to Quote on-site with potential to start asap.

Rough In work for a bathroom renovation in Frankston Soutth.

$1,000

Frankston South VIC, Australia

13th Dec 2021

Rough In work for a bathroom renovation in Frankston South. Job is ready to go - Due date: Needs to be done on Tuesday, 14th Dec 2021