Find local bathroom renovation experts in Richmond Tweed
Fill in a short form and get free quotes for professional bathroom renovation services in Richmond Tweed
Excellent rating - 4.3/5 (10900+ reviews)
Need help with bathroom renovation?
- Quote and planning
- Demolishing your old bathroom
- Prep for new bathroom
- Adding your new fixtures
- Final inspection and clean
- … or anything else
Recent Bathroom Renovation tasks in Richmond Tweed
Bathroom renovation
$800
Bexhill NSW, Australia
11th Sep 2024
Bathroom, toilet and laundry renovation By a qualified tradie.
Bathroom Reno, needing tiler
$300
Alstonville NSW, Australia
27th Feb 2024
So my husband and I are trying to fix our bathroom. We need a tiler to come and assess the flooring as there is an old self leveler on the ground. Just need to see if we need a new bedding done or can use what’s there to repair? Wanting the floor done right so we would love someone to help. We can rip the floor up but will need the tiler to do the floor it’s self
Plumber for bathroom Reno
$300
Alstonville NSW, Australia
24th Jan 2024
Need a plumber to move some tap connections, and check old pipes once we demo our bathroom. Then we will need then to connect once bathroom finished - Due date: Flexible
What is Airtasker?
Post your task
Tell us what you need, it's FREE to post.
Review offers
Get offers from trusted Taskers and view profiles.
Get it done
Choose the right person for your task and get it done.
- Get it done now. Pay later.
- Repay in 4 fortnightly instalments
- No interest
- Available on payments up to $1,500
Top Locations
What does a bathroom renovation include?
Experienced handymen, plumbers, and builders can help with small cosmetic changes to your bathroom. They’ll replace showerheads, taps, fit a shower screen door, or even plumb your toilet. But if you’re looking for a complete bathroom overhaul, you need a bathroom renovation specialist. Here’s what you can expect when working with bathroom renovation contractors and tradies:
Step 1. Quote and planning
Your bathroom renovator will normally need to visit your property to create an accurate quote. They’ll base their costings on the size of your bathroom, how long the project will take (usually 13-25 days for a whole bathroom renovation), and materials needed. You’re responsible for choosing and ordering any new fixtures and fittings - bath, toilet, units, tiles, etc. These should be paid for and delivered before the building start date. Your contractor will sent through the quote and draw up a blueprint for all tradespeople to work from, to ensure the project is kept on track.
Step 2. Demolishing your old bathroom
Builders and demolition professionals will strip out your old bathroom and knock through any walls. They’ll remove fixtures and either bin them, put them into storage, or cover them up so they’re protected during building work.
Step 3. Prep for new bathroom
Next, your plumber and electrician will carry out a rough-in fit. This means putting plumbing and electrical wiring in place without connecting it. Next, your carpenter, plasterer, and tiler will build or prepare your walls and floor for decorating. This can take 2-5 days depending on the size of your bathroom and drying time needed for plastering, rendering, and your undercoat of paint. Â Â
Step 4. Adding your new fixtures
Here you’ll really see your new bathroom come to life. First, your tiler will lay tiles and your painter will paint the walls. Once these are dry, your new bathroom furniture can be moved in. Your plumber and electrician now complete any connections. Your contractors will apply waterproofing and sealant around sinks, showers, and bathtubs. Finally, glass fixtures, like mirrors or shower doors, are installed.
Step 5. Final inspection and clean
With everything installed and dry, your bathroom renovator will carry out a final inspection. They’ll clear away and dispose of any bits leftover by the tradies. Your contractor might complete a basic clean, but you might also want to book a renovation cleaning service so your new bathroom is absolutely spick and span.
Recent Bathroom Renovation tasks in Richmond Tweed
Need a tiler for my bathroom reno
$2,000
Tweed Heads NSW, Australia
1st Oct 2023
Bathroom renovation, looking to have 4 walls and floor tiled, 1 x wall being a feature wall of around 300x80 tiles. Other walls and floor 450x450 tiles. Feature wall includes niche. Already organised own waterproofer. Looking to do it at the end of October - Due date: Flexible
Bathroom renovation
$4,000
Woodburn NSW, Australia
9th Dec 2022
Looking for a tradesperson to renovate bathroom. All tiles, vanity and toilet towel rail and shower glass etc will be supplied by owner.m Quote required. Flexible time frame. Tiles are here ready to start. Must be licenced. - Due date: Flexible
Bathroom renovations
$5,000
Stokers Siding NSW, Australia
20th Oct 2022
- complete bathroom renovation wanted. - New shower and basin and floor tiling wanted. - Due date: Flexible
Plumbing - bathroom renovation
$500
Lennox Head NSW, Australia
9th Oct 2022
Needing some help to turn some taps and toilet off so I can start a demolition for a bathroom renovation… 1 x bath, 1 x shower, 1 x toilet and 1 x basin - Due date: Needs to be done on Wednesday, 12 October 2022
Ensuite and main bathroom reno/retile
$4,000
Banora Point NSW, Australia
21st Sep 2021
We have the tiles ready to go Dates are flexible but looking for a quote ASAP Job will include full removal of old tiles, toilet, vanity and imstallation of new ones. We will source all the materials
Plumb-n taps for bathroom reno
$300
Banora Point NSW, Australia
27th Aug 2021
Plumb in 2 x mixers, 3 x outlets. Walls & pipe exposed
Bathroom Reno
$2,500
Tweed Heads NSW, Australia
19th Jun 2021
Pics are attached.....Bathroom Reno. Walls & floor need tiling. Toilet done. Vanity needs installing. Hv all the gear...hv grout and glue,tiles etc...4x3m. Sorry for reposting. I am not good with tech stuff.
I need bathroom renovation services
$2,000
Bilambil Heights NSW, Australia
8th Jan 2021
wanting to turn laundry into ensuite with shower, toilet and basin. area is already tiled and laundry basin has been removed. we are happy too buy shower, taps, basin and toilet. will just need it all installed and not sure if we need any pipes redirected or not, will need someone to take a look.
Bathroom renovations
$2,000
Lismore NSW, Australia
4th Jan 2021
2 x 3 meter bathroom needs renovating. tasks include but aren't limited to re-sheeting, building shower niche, Shower and floor tiled, shower screen, bath and vanity installed and any necessary supports added, door frame moved and replaced with cavity slider.
Help with bathroom renovations mid Jan
$5
Dunoon NSW, Australia
24th Nov 2020
I need help with tasks including but not limited to plastering walls and ceiling, tiling, building 2 x half walls and a door frame, installing extra support for a vanity if needed. Hoping to find someone who will charge an hourly rate. Task set at $5 but make an offer.