A contractor laying wall tiles for a bathroom renovation project.
A contractor laying wall tiles for a bathroom renovation project.

Find local bathroom renovation experts in Sunshine Coast

Fill in a short form and get free quotes for professional bathroom renovation services in Sunshine Coast

4.3

Excellent rating - 4.3/5 (10900+ reviews)

Need help with bathroom renovation?

  • Quote and planning
  • Demolishing your old bathroom
  • Prep for new bathroom
  • Adding your new fixtures
  • Final inspection and clean
  • … or anything else
It only takes 2 minutes. And it's free.
Up to 50% cheaper than franchise dealers
No job too big or small
Free insurance coverage
Secure cashless payments
Same day or next day service at no extra cost

Best rated bathroom renovators near me

What is Airtasker?

Post your task

Post your task

Tell us what you need, it's FREE to post.

Review offers

Review offers

Get offers from trusted Taskers and view profiles.

Get it done

Get it done

Choose the right person for your task and get it done.

Now Available
  • Get it done now. Pay later.
  • Repay in 4 fortnightly instalments
  • No interest
  • Available on payments up to $1,500

What does a bathroom renovation include?

Experienced handymen, plumbers, and builders can help with small cosmetic changes to your bathroom. They’ll replace showerheads, taps, fit a shower screen door, or even plumb your toilet. But if you’re looking for a complete bathroom overhaul, you need a bathroom renovation specialist. Here’s what you can expect when working with bathroom renovation contractors and tradies:

Step 1. Quote and planning

Your bathroom renovator will normally need to visit your property to create an accurate quote. They’ll base their costings on the size of your bathroom, how long the project will take (usually 13-25 days for a whole bathroom renovation), and materials needed. You’re responsible for choosing and ordering any new fixtures and fittings - bath, toilet, units, tiles, etc. These should be paid for and delivered before the building start date. Your contractor will sent through the quote and draw up a blueprint for all tradespeople to work from, to ensure the project is kept on track.

Step 2. Demolishing your old bathroom

Builders and demolition professionals will strip out your old bathroom and knock through any walls. They’ll remove fixtures and either bin them, put them into storage, or cover them up so they’re protected during building work.

Step 3. Prep for new bathroom

Next, your plumber and electrician will carry out a rough-in fit. This means putting plumbing and electrical wiring in place without connecting it. Next, your carpenter, plasterer, and tiler will build or prepare your walls and floor for decorating. This can take 2-5 days depending on the size of your bathroom and drying time needed for plastering, rendering, and your undercoat of paint.   

Step 4. Adding your new fixtures

Here you’ll really see your new bathroom come to life. First, your tiler will lay tiles and your painter will paint the walls. Once these are dry, your new bathroom furniture can be moved in. Your plumber and electrician now complete any connections. Your contractors will apply waterproofing and sealant around sinks, showers, and bathtubs. Finally, glass fixtures, like mirrors or shower doors, are installed.

Step 5. Final inspection and clean

With everything installed and dry, your bathroom renovator will carry out a final inspection. They’ll clear away and dispose of any bits leftover by the tradies. Your contractor might complete a basic clean, but you might also want to book a renovation cleaning service so your new bathroom is absolutely spick and span.

Recent Bathroom Renovation tasks in Sunshine Coast

Bathroom renovation vanity replacement

$500

Alexandra Headland QLD, Australia

6th Dec 2024

Replace vanity in bathroom

Plumber to rough in taps for bathroom Reno

$300

Buderim QLD 4556, Australia

16th Nov 2024

Looking to move 2 taps + shower mixer + 2 drains outlets + add toilet waste in bathroom (rough in only). Will be all marked out prior to your arrival. all pipes accessible under the house + will have walls demo’d to the frame. Is currently run with PEX pipe + PEX fitting. Probably 1/2 day work. Happy to arrange all materials prior or reimburse. Located buderim Flexible on rate Happy to work off hourly rate or fixed price

Plumber needed for bathroom Reno

$1,000

Glass House Mountains QLD, Australia

29th Dec 2023

To install shower and tap combo and water pipe through framed wall - Due date: Flexible

We found Adam to be very professional with his work ethics and a good communicator . We are very happy with the end result . Would highly recommend Adam .

Two bathroom renovation.

$9,999

Little Mountain QLD, Australia

14th Mar 2023

We need our bathrooms renovated. We have found water damage in the walls from the showers. We have a baby due in June and need them done asap. - Due date: Before Wednesday, 31 May 2023

Fixing door rollers, window repairs, bathroom reno

$3,000

Coolum Beach QLD, Australia

7th Mar 2023

Looking at renovating a 3m x 3m bathroom in a unit. Removal of wall tiles, fixing rollers on glass doors. Some painting work also.

Bathroom Renovation

$5

Mount Coolum QLD, Australia

16th Jan 2023

I have a small bathroom that I need completely renovated. I need quotes and someone to attend in person to view. - Due date: Flexible

Remove and install small bathroom fixtures

$120

Kunda Park QLD 4556, Australia

19th Nov 2022

Remove and replace: - wall mounted toilet paper holder -wall mounted guest towel ring -door handle - Due date: Flexible

Tim was punctual, polite and completed the task just as required!

Very small bathroom reno - new shower + remove cupboard

$2,500

Diddillibah QLD 4559, Australia

11th Oct 2022

Help! My shower is gross and needs to be ripped out and redone, including a new shower head and glass. Currently there's a half-tub at the bottom and then sliding doors, all of that needs to go and be replaced with something easy and minimal. I'd love to look at re-tiling as well. Also need a couple cupboards removed. - Due date: Flexible

Bathroom renovation

$5

Parrearra QLD, Australia

10th Sep 2022

Price TBC- would prefer a discussion. We want a bath! Current bathroom has shower and 2 sinks, we’d like it transformed to a bath with overhead shower, 1x sink and 1x toilet. Completed before Christmas. Dimensions roughly 2x2m, with small window. - Due date: Before Tuesday, 20 December 2022

Plumber for bathroom reno

$5

Wurtulla QLD, Australia

29th Aug 2022

Rough in for bathroom reno then completion after tiling. Turning off water to kitchen.

Kitchen + 2 Bathroom Renovation

$9,999

Mountain Creek QLD, Australia

22nd Aug 2022

- Remove old kitchen cabinets and prep space for IKEA kitchen - Install new IKEA kitchen - Renovate two small bathrooms, we have most materials already

Bathroom Renovation x 2

$9,999

Buderim, Queensland, Australia

7th Jun 2022

I have two bathrooms that need complete renovation. One is already gutted and the other is operational. Hoping I can source tiles and vanities etc to keep costs down. Looking for someone licensed to complete between June 20 and July 30 ideally. Airtasker limits offer amount to $9999

Tiling and bathroom reno

$2,000

Mountain Creek QLD, Australia

29th May 2022

Needing a quote for professional tiling and shower reframing. - Due date: Before Monday, 13 June 2022

Painting post bathroom reno

$300

Coolum Beach QLD, Australia

26th Apr 2022

Just need someone to paint my bathroom and powder room, has just undergone a reno and needing a good painter that can help with finishing touch, am negotiable on price and happy for quotes before hand

Bathroom renovation. Room is 10m2

$5,000

Buderim QLD 4556, Australia

9th Feb 2022

Bathroom renovation. Take out old bathtub and install new. Take off old cupboard top and install granite. Toilet to stay as is. shower to stay as is but new floor and wall tiles. - Due date: Flexible

Carpenter or Handyman for some bathroom renos

$2,000

Nambour QLD, Australia

27th Jan 2022

Remove old laundry tub, make a gyprock wall & doorway to enclose laundry & bathroom. Box in some areas. - Due date: Before Monday, 7th Feb 2022

Bathroom reno

$2,500

Coes Creek QLD, Australia

8th Nov 2021

2 shower screens and bases replaced. 1 toilet replaced Small amount of tiling and waterproofing - Due date: Before Monday, 20th Dec 2021

Bathroom reno (Capenter)

$1,500

Burnside QLD, Australia

15th Oct 2021

We are looking for a reliable Capenter to help reno a small bathroom . fit and build the bath in , shampoo shelves , fit vanity , possibly new walls after we rip old tiles out - Due date: Needs to be done on Wednesday, 10th Nov 2021

Bathroom renovation

$5,000

Mooloolaba QLD, Australia

19th Sep 2021

Renovations to upstairs bathroom in 3 bedroom town house ,demolish vanity, bath, shower and tiles. Install new tiles, bath, shower, vanity. Tiles replacement in seperate toilet.

Plastering on small bathroom reno

$200

Wurtulla QLD, Australia

12th Aug 2021

Small bathroom Renovation. Apply some sheeting. About 1 x 2400x1200 cut into about 3 pieces. 3 external corners and a couple of internal. Tradesman only