Find local bathroom renovation experts in Sutherland Shire
Fill in a short form and get free quotes for professional bathroom renovation services in Sutherland Shire
Excellent rating - 4.3/5 (10900+ reviews)
Need help with bathroom renovation?
- Quote and planning
- Demolishing your old bathroom
- Prep for new bathroom
- Adding your new fixtures
- Final inspection and clean
- … or anything else
Best rated bathroom renovators near me
Latest Review
"Good job all done great"
Verified Badges
ID Verified
Mobile Verified
Latest Review
"Talal completed the work efficiently and was very easy to communicate with. He was professional throughout, and I’m tota..."
Verified Badges
ID Verified
NSW Electrical Licence
Mobile Verified
Latest Review
"Super friendly and efficient "
Verified Badges
COVID-19 Vaccination
NSW Electrical Licence
Mobile Verified
Latest Review
"Jian helped me on the leaking tap, good communication nice guy to work with "
Verified Badges
COVID-19 Vaccination
ID Verified
Mobile Verified
What is Airtasker?
Post your task
Tell us what you need, it's FREE to post.
Review offers
Get offers from trusted Taskers and view profiles.
Get it done
Choose the right person for your task and get it done.
- Get it done now. Pay later.
- Repay in 4 fortnightly instalments
- No interest
- Available on payments up to $1,500
What does a bathroom renovation include?
Experienced handymen, plumbers, and builders can help with small cosmetic changes to your bathroom. They’ll replace showerheads, taps, fit a shower screen door, or even plumb your toilet. But if you’re looking for a complete bathroom overhaul, you need a bathroom renovation specialist. Here’s what you can expect when working with bathroom renovation contractors and tradies:
Step 1. Quote and planning
Your bathroom renovator will normally need to visit your property to create an accurate quote. They’ll base their costings on the size of your bathroom, how long the project will take (usually 13-25 days for a whole bathroom renovation), and materials needed. You’re responsible for choosing and ordering any new fixtures and fittings - bath, toilet, units, tiles, etc. These should be paid for and delivered before the building start date. Your contractor will sent through the quote and draw up a blueprint for all tradespeople to work from, to ensure the project is kept on track.
Step 2. Demolishing your old bathroom
Builders and demolition professionals will strip out your old bathroom and knock through any walls. They’ll remove fixtures and either bin them, put them into storage, or cover them up so they’re protected during building work.
Step 3. Prep for new bathroom
Next, your plumber and electrician will carry out a rough-in fit. This means putting plumbing and electrical wiring in place without connecting it. Next, your carpenter, plasterer, and tiler will build or prepare your walls and floor for decorating. This can take 2-5 days depending on the size of your bathroom and drying time needed for plastering, rendering, and your undercoat of paint. Â Â
Step 4. Adding your new fixtures
Here you’ll really see your new bathroom come to life. First, your tiler will lay tiles and your painter will paint the walls. Once these are dry, your new bathroom furniture can be moved in. Your plumber and electrician now complete any connections. Your contractors will apply waterproofing and sealant around sinks, showers, and bathtubs. Finally, glass fixtures, like mirrors or shower doors, are installed.
Step 5. Final inspection and clean
With everything installed and dry, your bathroom renovator will carry out a final inspection. They’ll clear away and dispose of any bits leftover by the tradies. Your contractor might complete a basic clean, but you might also want to book a renovation cleaning service so your new bathroom is absolutely spick and span.
Recent Bathroom Renovation tasks in Sutherland Shire
Kitchen renovation and bathroom renovation in a unit in Miranda
$5
Miranda NSW, Australia
11th Apr 2023
Needs new cabinet for kitchen for bathroom needs tiling and waterproofing frameless shower needed - Due date: Flexible
Electrician for bathroom renovation
$900
Caringbah NSW, Australia
12th Oct 2022
Looking for electrician for works with a bathroom renovation. Wiring outlet for smart toilet. Wiring set of fan/heater lights and lights on the ceiling. Wiring led lightgrom shaving cabinet in the same circuit as the lights. Wiring towel rack heated. At the moment the only circuit in the bathroom is the lights and a outlet. Can access the ceiling if needed. The walls are hollow. Drywall The job is located in Caringbah. I will start on the demolition on 21 October and would need to get that done around 24 October, so I can start tiling. Let me know if there is any question. - Due date: Needs to be done on Monday, 24 October 2022
Very good, friendly and reliable workers, did the job very well, helped with everything. Would recommend to everyone!
Bathroom reno inspection
$5
Miranda NSW, Australia
11th Oct 2022
Need quote for a main bath and toilet and ensuite. Job in Miranda. Accept quote to discuss site visit.
Small bathroom Renovation
$1,800
Sutherland NSW, Australia
11th Feb 2022
Remove toilet & install a new one. Install new handbasin only Install new smaller tub Install shower door and tile the bathroom Install new tap fitting and showerhead. All bathroom fittings will be supplied. Need someone reliable and experienced in bathroom renos - no time-wasters!! - Due date: Needs to be done on Monday, 28th Feb 2022
Bathroom renovation
$5,000
Heathcote NSW, Australia
22nd Dec 2021
I need a shower shell removed and wall waterproofed and tiled. Then a shower screen put in. - Due date: Flexible
Ensuite bathroom Reno.
$100
Caringbah South NSW, Australia
23rd Nov 2021
We need an ensuite bathroom ripped out and everything done apart from installing the vanity. Please get in touch if you could possibly do this before Christmas. Pictures of existing bathroom to follow. Plans of new design to follow. This job will be for rip out, gyprock, waterproofing, tiling, recess in shower as per design, plumbing of tap, shower head, toilet etc and electrical. We will organise shower screen, vanity, accessories. - Due date: Before Saturday, 15th Jan 2022
Excellent communication to schedule all the different trades involved in a bathroom reno. All the tradies that came were friendly, professional and easy to have in the home. This was important to us, with young children around and pets in the house. They were always conscious of not making mess, or causing too much disruption within our home. Any changes needed, or concerns we had, were dealt with straight away. Very happy with their work. Would highly recommend and use again. Thank you.
Complete Bathroom renovation
$9,999
Illawong NSW, Australia
6th Aug 2021
- remove existing bathroom - repair any moisture damaged timber - complete waterproofing - tilling - install new bath/shower - install vanity
Bathroom Renovation - Licenced Electrician Rquired
$150
Jannali NSW 2226, Australia
20th Jun 2021
Licenced electrician required to connect items for a bathroom renovation. All items/wiring will be in place ready to be connected: - 1 light switch (5 gang) - 2 power outlets - 1 vanity light - 3 in 1 light/heat/fan unit
I need bathroom renovation services
$9,999
Menai NSW, Australia
1st Apr 2021
We are buying a new place and would like renovations carried out. There is ensuite bathroom , a separate toilet and another bathroom. Might need Tiles up to the ceiling, vanity (not sure). Also. It sure if how much it will cost if we decide to combine toilet and bathroom which will mean wall needs to be knocked down.
I need bathroom renovation services
$400
Yarrawarrah NSW 2233, Australia
18th Mar 2021
Vanity, bath and tile resurfacing to change colour to white
Bathroom renovations
$1,000
Engadine NSW, Australia
17th Feb 2021
small bathroom needs to be tiled and replaced with new tiles, shower etc
I need bathroom renovation service
$8,000
Sutherland NSW 2232, Australia
22nd Jan 2021
Remove and re-tile, waterproofing, install new shower screen, new vanity and new toilet bowl, remove bathtub. Bathroom size 2.200m x 2.800m. To be done by the end of March 2021 - ( next page date choice does not work)