A contractor laying wall tiles for a bathroom renovation project.
A contractor laying wall tiles for a bathroom renovation project.

Find local bathroom renovation experts in Wide Bay

Fill in a short form and get free quotes for professional bathroom renovation services in Wide Bay

4.3

Excellent rating - 4.3/5 (10900+ reviews)

Need help with bathroom renovation?

  • Quote and planning
  • Demolishing your old bathroom
  • Prep for new bathroom
  • Adding your new fixtures
  • Final inspection and clean
  • … or anything else
It only takes 2 minutes. And it's free.
Up to 50% cheaper than franchise dealers
No job too big or small
Free insurance coverage
Secure cashless payments
Same day or next day service at no extra cost

Best rated bathroom renovators near me

What is Airtasker?

Post your task

Post your task

Tell us what you need, it's FREE to post.

Review offers

Review offers

Get offers from trusted Taskers and view profiles.

Get it done

Get it done

Choose the right person for your task and get it done.

Now Available
  • Get it done now. Pay later.
  • Repay in 4 fortnightly instalments
  • No interest
  • Available on payments up to $1,500

What does a bathroom renovation include?

Experienced handymen, plumbers, and builders can help with small cosmetic changes to your bathroom. They’ll replace showerheads, taps, fit a shower screen door, or even plumb your toilet. But if you’re looking for a complete bathroom overhaul, you need a bathroom renovation specialist. Here’s what you can expect when working with bathroom renovation contractors and tradies:

Step 1. Quote and planning

Your bathroom renovator will normally need to visit your property to create an accurate quote. They’ll base their costings on the size of your bathroom, how long the project will take (usually 13-25 days for a whole bathroom renovation), and materials needed. You’re responsible for choosing and ordering any new fixtures and fittings - bath, toilet, units, tiles, etc. These should be paid for and delivered before the building start date. Your contractor will sent through the quote and draw up a blueprint for all tradespeople to work from, to ensure the project is kept on track.

Step 2. Demolishing your old bathroom

Builders and demolition professionals will strip out your old bathroom and knock through any walls. They’ll remove fixtures and either bin them, put them into storage, or cover them up so they’re protected during building work.

Step 3. Prep for new bathroom

Next, your plumber and electrician will carry out a rough-in fit. This means putting plumbing and electrical wiring in place without connecting it. Next, your carpenter, plasterer, and tiler will build or prepare your walls and floor for decorating. This can take 2-5 days depending on the size of your bathroom and drying time needed for plastering, rendering, and your undercoat of paint.   

Step 4. Adding your new fixtures

Here you’ll really see your new bathroom come to life. First, your tiler will lay tiles and your painter will paint the walls. Once these are dry, your new bathroom furniture can be moved in. Your plumber and electrician now complete any connections. Your contractors will apply waterproofing and sealant around sinks, showers, and bathtubs. Finally, glass fixtures, like mirrors or shower doors, are installed.

Step 5. Final inspection and clean

With everything installed and dry, your bathroom renovator will carry out a final inspection. They’ll clear away and dispose of any bits leftover by the tradies. Your contractor might complete a basic clean, but you might also want to book a renovation cleaning service so your new bathroom is absolutely spick and span.

Recent Bathroom Renovation tasks in Wide Bay

Bathroom renovation

$1,111

Bundaberg QLD, Australia

15th Sep 2024

Full bathroom reno Need to remove asbestos Wanting some quotes.

Bathroom reno

$8,000

South Kolan QLD, Australia

13th Aug 2023

Farm house needs new simple bathroom fit out - Due date: Flexible

Bathroom Renovation

$5,000

Pie Creek QLD, Australia

12th Apr 2022

Need a bathroom renovation - I'm able to help with removal of old bathroom tiles etc. Looking for a quote at this stage. 3 x 2m room in besser block house. Not wanting to change plumbing locations - maybe add a bath??? - Due date: Before Monday, 13 June 2022

Small bathroom Reno

$5,500

Rainbow Beach QLD, Australia

17th Mar 2022

Remove old bathroom Waterproof bathroom , new sink, toilet, shower , tiling etc. I will be in unit this weekend. Labour only

Bathroom Reno

$8,000

Carters Ridge QLD, Australia

7th Sep 2021

Looking for a tiler to do a bathroom Reno. Plumbing will stay in the same spots - looking to retile, new bath, shower and vanity.

Bathroom renovation

$4,000

Avenell Heights QLD 4670, Australia

1st Jul 2021

Has shower recess but needs plasterboard up, waterproofing, tiling, door attached. Bathroom floor leveling concrete and tiles laid. Possible installation of vanity. We have all items (tiles, shower plasterboard and door etc) except vanity. Quote and work required as soon as possible.

Plumber needed For bathroom Reno

$500

Scarness QLD, Australia

21st Mar 2021

Bathroom Reno. Need a plumber this week to rough in

Electrician for bathroom Reno

$50

Scarness QLD, Australia

15th Mar 2021

Need an electrician to rough in electrics for bathroom Reno. Needs to be available late this week.

Highly recommend Allan - turns up on time, excellent communication and quality workmanship.