A white van parked on a street, with a person standing next to it, ready to load or unload items.
A white van parked on a street, with a person standing next to it, ready to load or unload items.

Find a professional Villaboard contractor in Central Coast

Fill in a short form and get free quotes for local Villaboard contractors in Central Coast

4.3

Excellent rating - 4.3/5 (10900+ reviews)

Get help from a local villaboard installer

  • Bathroom walls
  • Waterproofing
  • Painted villaboards
  • … or anything else
It only takes 2 minutes. And it's free.
Up to 50% cheaper than franchise dealers
No job too big or small
Free insurance coverage
Secure cashless payments
Same day or next day service at no extra cost

Recent Villaboard Installation tasks in Central Coast

Supply, install, set & sand approx 1.5m2 of 6mm Villaboard

$150

Umina Beach NSW, Australia

27th Oct 2024

I will have a small job requiring villaboard to be set and sanded for a laundry. My plumber will bring up 2 pipes to connect to the washing machine so will need to cut through the existing villaboard. Not a huge job - probably under 2m2 of villaboard and hopefully will get this happening over the next 2 weeks. I’m in umina. If you are interested in the job and quoting please message me. Thank you

Set joints on villaboard new bathroom

$200

Gorokan NSW, Australia

15th Jan 2024

Set villaboard joins with base coat only - Due date: Before Wednesday, 17 January 2024

Nail and set villa board in ensuit

$500

Bucketty NSW 2250, Australia

18th Sep 2023

Cut and nail villaboard and set joints for tiles - Due date: Flexible

Gyp walls 138 sq.m and Villaboard for bathroom - 25 sq.m. No Cornices

$4,500

Woy Woy NSW, Australia

7th Jul 2022

1st Floor, 1.8m wide straight stairs, parking close to stairs. I have removed all of old lining and asking for a quote to reline. No cornices required as I will install quad. - Due date: Before Thursday, 14 July 2022

What is Airtasker?

Post your task

Post your task

Tell us what you need, it's FREE to post.

Review offers

Review offers

Get offers from trusted Taskers and view profiles.

Get it done

Get it done

Choose the right person for your task and get it done.

Now Available
  • Get it done now. Pay later.
  • Repay in 4 fortnightly instalments
  • No interest
  • Available on payments up to $1,500

What does a Villaboard installation include?

Your installer can help with every step from advice on the best materials through to the actual Villaboard installation. Here’s what you can expect:


Villaboard wall installation

Your installation professional will start by helping you choose the right type of Villaboard sheeting. 6mm is standard for residential applications, while commercial applications usually use 9mm or 12mm in heavy-duty situations. If your existing wall sheeting needs removal, they’ll assist with this, but otherwise, they’ll get straight into measuring the space to determine the best placement for your Villaboard installation. Your installer will add internal angles into any corners before they start. They’ll work from ceiling to floor, so they’ll need to start by installing a nail ledge on the joist to rest the top sheets on. Lifting and installing Villaboard is a two-person job because they’re very heavy materials. They’ll rest the panel on the nail ledge, slide it into place, and nail it into the studs. Once the top row is installed, your installer will add the bottom row, staggering the sheets to avoid floor to ceiling join lines. If a panel needs holes for electricals or plumbing, your technician will mark and cut these holes before installing. If they need to cut smaller pieces, they’ll use a special cutter to cut the board down to size. Your installer will continue working until all gaps are covered. Finally, they’ll patch up any joints and nail holes by applying coats of compound and paper tape, smoothing the surface as they go.


Villaboard ceiling installation

Installing Villaboard ceilings is a similar process. Your installer will use both nails and adhesive to secure your staggered sheeting to the framing. Once both your ceilings and walls are installed, they’ll finish off the joints and corners and cover up nail holes with compound. Then they’ll install regular plaster cornices using adhesive and setting compound.


Villaboard repairs

Villaboard is a tough material but it can sometimes need repairing, especially if you’ve removed tiles from the surface during a renovation. If it’s a very small hole, crack, or scratch, your technician may be able to use compound to patch the surface. But if it’s a larger hole, your technician will cut around it to make a clean shape, then they’ll cut a matching shape from wood to fit into the hole. They’ll secure this with stud adhesive and screws before covering the surface of the wood with gyprock compound. Once dry, they’ll sand this back to smooth, vacuum away the dust and apply a thin topcoat of compound. Finally, they’ll sand once again and it’ll be ready to paint.Â