Find local bathroom renovation experts in North Brisbane
Fill in a short form and get free quotes for professional bathroom renovation services in North Brisbane
Excellent rating - 4.3/5 (10900+ reviews)
Need help with bathroom renovation?
- Quote and planning
- Demolishing your old bathroom
- Prep for new bathroom
- Adding your new fixtures
- Final inspection and clean
- … or anything else
Best rated bathroom renovators near me
Latest Review
"Super helpful friendly and professional"
Verified Badges
ID Verified
Mobile Verified
Latest Review
"Nicholas was easy to work with, demonstrating excellent communication skills throughout the process."
Verified Badges
ID Verified
Mobile Verified
Latest Review
"⭐️⭐️⭐️⭐️⭐️⭐️⭐️⭐️⭐️⭐️Mark is so knowledgeable, professional and so easy to deal with. It was a pleasure working with him ..."
Verified Badges
Mobile Verified
Latest Review
"Great individual who pays close attention to detail and completes tasks to a very high standard. Thank you for your eff..."
Verified Badges
Mobile Verified
What is Airtasker?
Post your task
Tell us what you need, it's FREE to post.
Review offers
Get offers from trusted Taskers and view profiles.
Get it done
Choose the right person for your task and get it done.
- Get it done now. Pay later.
- Repay in 4 fortnightly instalments
- No interest
- Available on payments up to $1,500
Top Locations
What does a bathroom renovation include?
Experienced handymen, plumbers, and builders can help with small cosmetic changes to your bathroom. They’ll replace showerheads, taps, fit a shower screen door, or even plumb your toilet. But if you’re looking for a complete bathroom overhaul, you need a bathroom renovation specialist. Here’s what you can expect when working with bathroom renovation contractors and tradies:
Step 1. Quote and planning
Your bathroom renovator will normally need to visit your property to create an accurate quote. They’ll base their costings on the size of your bathroom, how long the project will take (usually 13-25 days for a whole bathroom renovation), and materials needed. You’re responsible for choosing and ordering any new fixtures and fittings - bath, toilet, units, tiles, etc. These should be paid for and delivered before the building start date. Your contractor will sent through the quote and draw up a blueprint for all tradespeople to work from, to ensure the project is kept on track.
Step 2. Demolishing your old bathroom
Builders and demolition professionals will strip out your old bathroom and knock through any walls. They’ll remove fixtures and either bin them, put them into storage, or cover them up so they’re protected during building work.
Step 3. Prep for new bathroom
Next, your plumber and electrician will carry out a rough-in fit. This means putting plumbing and electrical wiring in place without connecting it. Next, your carpenter, plasterer, and tiler will build or prepare your walls and floor for decorating. This can take 2-5 days depending on the size of your bathroom and drying time needed for plastering, rendering, and your undercoat of paint.
Step 4. Adding your new fixtures
Here you’ll really see your new bathroom come to life. First, your tiler will lay tiles and your painter will paint the walls. Once these are dry, your new bathroom furniture can be moved in. Your plumber and electrician now complete any connections. Your contractors will apply waterproofing and sealant around sinks, showers, and bathtubs. Finally, glass fixtures, like mirrors or shower doors, are installed.
Step 5. Final inspection and clean
With everything installed and dry, your bathroom renovator will carry out a final inspection. They’ll clear away and dispose of any bits leftover by the tradies. Your contractor might complete a basic clean, but you might also want to book a renovation cleaning service so your new bathroom is absolutely spick and span.
Recent Bathroom Renovation tasks in North Brisbane
Bathroom renovation
$5
Carseldine QLD, Australia
17th Aug 2024
Required bathroom to be re done. Water leaking through the floor. Old queenslander house on the stump. Required floor to be re done and add toilet.
Bathroom renovation
$8,500
Boondall QLD, Australia
7th Aug 2024
Full Bathroom renovation- Complete demolishing the existing bathroom. Waterproofing, retiling floor-to-ceiling, repipeing, New vanity, shower glass, bathtub and 2 toilet change, new lights.
2x Bathroom renovations and sewage pipe repair
$8,000
Carseldine QLD, Australia
25th Jun 2024
Looking for a licensed and experienced tradesman to complete 2 x Bathroom Renovations and Bathroom Sewage Pipe Repair in a 2-level townhouse Details: -Demolition of the tiles in both bathrooms -Removal of 2 toilets, 1 bathtub, 2 vanities, all fixtures and both shower screens -Fix a sewage pipe under the floor that connects both bathrooms, the inclination of the pipe needs to be rectified for proper drainage (SEEN IN PHOTOS - YELLOW LINE/PIPE ONLY. ISSUE DESCRIPTION ALSO ATTACHED) -Waterproof both bathrooms -Re-tile both bathrooms (Floors, Walls to the roof, and showers) -Install both vanities and mirror shelf modules -Install the bathtub and toilets -Install both shower doors -Install all tapware and bathroom accessories *NOTE: Hot water runs on gas. WE WILL SUPPLY: All new bathroom accessories, toilets, cabinets, shower doors, bathtub and tiles. We will hire an electrician to complete any electrical work.
BATHROOM RENOVATION WITH WATERPROOFING
$10
McDowall, Queensland, Australia
23rd Mar 2024
Just the basic level bathroom Renovation and waterproofing. Need to do it only beacause of a crack on the fibre tray on the bathroom floor. Please message your quote in the reply/comment box first!
Bathroom Renovation
$123
Zillmere QLD, Australia
5th Feb 2024
I have a small bathroom where the waterproofing has failed and the floorboards underneath have evidence of water damage. Looking to gut the bathroom to the frame and joists and redo from scratch. Final bathroom size will be approximately 1900 x 2400 with high ceilings. Walls may contain asbestos and will get tested prior to work. Bathroom work to include: • Full demo of current bathroom • Removal of linen cupboard • Inspection of joists • Plumbing • Minor Electrical work • New waterproof subfloor • Removing old Vertical window and installing horizontal window • Framing as required • Wall Sheeting • Waterproofing • Tiling • Install Bathtub/Shower Combo, Toilet, and Vanity • Door and fittings • Etc Photos attached show current bathroom and possible future layout. Final design and fittings to be discussed through in consultation. House is 1960s build on concrete stumps. - Due date: Flexible
Need help with bathroom reno, painting, and repairs in a small villa
$20
Taigum QLD, Australia
28th Dec 2023
Need help with a bathroom reno, painting and small repairs in a villa. Bathroom Reno - Full renovation of a small bathroom, removing existing shower over tub, vanity, and tiling, replacing with shower, new vanity and tiling to ceiling. Full service including waterproofing required. We can supply some supplies (tiling, tapware, shower head, vanity) Painting - Professional painting of a two bedroom villa including entry way, two bedrooms, living room, bathroom, separate toilet, and connected garage. Walls, cupboard doors, skirting, patch repair on the roof in the kitchen, and kitchen cabinetry too. Small repairs - fixing a retaining wall in the courtyard, and fixing a small concrete strip by the front door. We need the work to be carried out between Jan 12 - 31, by licensed and insured trades, with an itemised quote and invoice please. Am hoping to get 2-3 quotes so I can compare. Thank you so much for your time. - Due date: Flexible
Bathroom renovation
$80
Taigum QLD, Australia
27th Dec 2023
Full renovation of a small bathroom, removing existing shower over tub, vanity, and tiling, replacing with shower, new vanity and tiling. Full service including waterproofing required. Please provide an itemised quote - my husband may be able to supply shower head, vanity, tap ware, tiling, grout, waterproofing and glue/silicone supplies if more cost efficient (NB not labour). See details in pics. Hoping to do this as bathtub in rental property is old and we may have a water proofing issue. Will need a proper receipt please for tax purposes. If possible, also need a builder to help fix a retaining wall in the property courtyard. Please see pics and quote separately if feasible. Due date flexible, but ideally between Jan 8 and 26. Thank you so much - Due date: Flexible
Bathroom renovation
$1,000
Zillmere QLD, Australia
21st Nov 2023
Need to renovate toilet and bathroom.also need to change the direction of the entrance of the bathroom - Due date: Flexible
Qualified carpenter for bathroom renovation
$10
Bridgeman Downs QLD, Australia
29th Sep 2023
Bathroom (ensuite) renovation due to leak. Pictures attached. Repair/replace beam/floor/walls as required. Flexible with timing however prefer sooner rather than later. Happy to agree on price…. - Due date: Flexible
Bathroom renovation
$1,500
Bridgeman Downs QLD, Australia
25th May 2023
Remove step from shower and replace door, so that floor is flat. Will need to be ceiling of tiles under the door, ground floor area. - Due date: Flexible
Bathroom renovations x 2, kitchen revamp, new lights
$9,000
Bracken Ridge QLD 4017, Australia
2nd May 2023
2 x Bathrooms (1 x bathroom single shower & 1 x ensuite double shower) BOTH require: • Retiling, • Shower stall removal (including one pan) • Replace shower stall with fixed panel (discuss preferences with owner) • Some fittings replacement (discuss necessities with owner) • Vanity and sink replacement • Mirrors (owner would like to salvage/save mirrors if possible) • Light/heat & exhaust fan replacement with single unit • Toilets may/may not require replacement (discuss with owner) NOTE: Quote each bathroom separately. Owner may wish to complete them individually based on cost, time and disruption (discuss with owner) NOTE: Owner requires other services that you are welcome to also quote individually on; IF you are interested in that work (Discuss with owner) • Replace all light fittings in the home with down lights • Refresh existing kitchen with new cupboard doors, drawers and hardware, new modern sink with fittings and appropriate plumbing. • Internal home repaint; walls and ceilings. NOTE: Owners time is limited. With respect; please be punctual to any appointment you make for inspection. - Due date: Flexible
Bathroom renovation
$4,000
Boondall QLD, Australia
28th Feb 2023
Bathroom renovation guide - Due date: Flexible
Bathroom Renovation / relocation of laundry
$10
Kedron QLD 4031, Australia
27th Feb 2023
Looking to renovated a bathroom. Replace Floor to ceiling tiles, reconfigure toilet direction. Reconfigure shower to be a ceiling rain shower etc Remove laundry from bathroom and relocate to spare room. Would like in person discussion of options and to then provide formal quote and availability etc - Due date: Flexible
Small bathroom renovation
$25
Bracken Ridge QLD 4017, Australia
26th Feb 2023
We have a small bathroom that needs renovating. The bath will be permanently removed to allow for a bigger shower, a new shower screen, tiled and vanity and tapware installed. Would like this started and completed within the month of May. This a temporary solution as the house will eventually be demolished in a year or 2 so nothing fancy or expensive required. - Due date: Before Wednesday, 31 May 2023
Bathroom renovation
$2,500
McDowall QLD, Australia
19th Feb 2023
Small ensuit bathroom (floor=4 sqm, wall=4 sqm), demolish floor and wall tiles and shower screen, water proofing, install new tiles, grouting and sealing, put the toilet bowl and taps back. no basin/mirror needed. remove the rubbish. - Due date: Flexible
Bathroom renovations
$5
Aspley QLD, Australia
27th Dec 2022
Looking for quotes to complete a 2 bathroom renovations will require re plumbing - Due date: Flexible
Plastering for bathroom renovations
$100
Northgate QLD, Australia
13th Aug 2022
Hi I am having two bathrooms renovated and need a plasterer. I am not sure exactly what needs to be done but have a builder involved so he can direct. Not expecting it will be a big job. - Due date: Flexible
Plumbing-Bathroom renovation
$1,200
McDowall QLD, Australia
9th Jul 2022
1. Changing the S trap toilet to wall hung toilet (P trap) and install inwall Cistern. 2. Changing Vanity tap to the inwall mixer and reposition drain from floor to the wall for wall hung vanity. 3. Install bathroom mixer and shower head 4. Install bathtub mixer 5. Reposition laundry tap - Due date: Flexible
Bathroom renovation
$7,500
Chermside QLD, Australia
8th Jul 2022
* Removal and disposal of all the asbestos in the bathroom area. * Complete bathroom strip out including removal of toilet and shower base * Capping off plumbing * Removal of rubbish/waste * Waterproofing * Tiling of walls and sheeting of ceiling * Provision and installation of shower, toilet suite and vanity / sink *Tiling of floor Small 3sqm powder-room / bathroom - Due date: Flexible
Small bathroom reno
$2,000
Taigum QLD, Australia
20th Jun 2022
Hello, I am wanting to re-do 2bathrooms on a budget but starting with 1 first. I would like to discuss what needs to be done and go from there but we are looking at re-tiling floor, walls, shower and vanity. thanks - Due date: Flexible