A contractor laying wall tiles for a bathroom renovation project.
A contractor laying wall tiles for a bathroom renovation project.

Find local bathroom renovation experts in North East Melbourne

Fill in a short form and get free quotes for professional bathroom renovation services in North East Melbourne

4.3

Excellent rating - 4.3/5 (10900+ reviews)

Need help with bathroom renovation?

  • Quote and planning
  • Demolishing your old bathroom
  • Prep for new bathroom
  • Adding your new fixtures
  • Final inspection and clean
  • … or anything else
It only takes 2 minutes. And it's free.
Up to 50% cheaper than franchise dealers
No job too big or small
Free insurance coverage
Secure cashless payments
Same day or next day service at no extra cost

Best rated bathroom renovators near me

Recent Bathroom Renovation reviews in North East Melbourne

Very helpful and professional in helping me with bathroom renovation ideas.

Bathroom renovation

$10

Awesome work. Great blokes and very professional. Thanks for an awesome hassle free job.

Mount bathroom fixtures and fittings

$300

matt was great he made sure task was done properly

Hang mirrors and bathroom fixtures

$400

Great workmanship, helpful and friendly. Helped us finish off our renovation.

Bathroom renovation installation

$1,000

He is very good with explaining things and good work done

Quote for Bathroom renovation & new bathroom

$20

Ibrahim was professional, quick to respond & did a great job on replacing our rotten timber!

Carpenter needed for bathroom renovation

$200

Average reviews for Bathroom Renovation Services in North East Melbourne

based on 12 reviews

5

12
0
0
0
0

What is Airtasker?

Post your task

Post your task

Tell us what you need, it's FREE to post.

Review offers

Review offers

Get offers from trusted Taskers and view profiles.

Get it done

Get it done

Choose the right person for your task and get it done.

Now Available
  • Get it done now. Pay later.
  • Repay in 4 fortnightly instalments
  • No interest
  • Available on payments up to $1,500

14+

Tasks successfully completed

3

Average amount of offers per task

27

 mins

Average time to receive offers

Statistics from the most recent tasks on Airtasker since 3rd Jan 2021.

What does a bathroom renovation include?

Experienced handymen, plumbers, and builders can help with small cosmetic changes to your bathroom. They’ll replace showerheads, taps, fit a shower screen door, or even plumb your toilet. But if you’re looking for a complete bathroom overhaul, you need a bathroom renovation specialist. Here’s what you can expect when working with bathroom renovation contractors and tradies:

Step 1. Quote and planning

Your bathroom renovator will normally need to visit your property to create an accurate quote. They’ll base their costings on the size of your bathroom, how long the project will take (usually 13-25 days for a whole bathroom renovation), and materials needed. You’re responsible for choosing and ordering any new fixtures and fittings - bath, toilet, units, tiles, etc. These should be paid for and delivered before the building start date. Your contractor will sent through the quote and draw up a blueprint for all tradespeople to work from, to ensure the project is kept on track.

Step 2. Demolishing your old bathroom

Builders and demolition professionals will strip out your old bathroom and knock through any walls. They’ll remove fixtures and either bin them, put them into storage, or cover them up so they’re protected during building work.

Step 3. Prep for new bathroom

Next, your plumber and electrician will carry out a rough-in fit. This means putting plumbing and electrical wiring in place without connecting it. Next, your carpenter, plasterer, and tiler will build or prepare your walls and floor for decorating. This can take 2-5 days depending on the size of your bathroom and drying time needed for plastering, rendering, and your undercoat of paint.   

Step 4. Adding your new fixtures

Here you’ll really see your new bathroom come to life. First, your tiler will lay tiles and your painter will paint the walls. Once these are dry, your new bathroom furniture can be moved in. Your plumber and electrician now complete any connections. Your contractors will apply waterproofing and sealant around sinks, showers, and bathtubs. Finally, glass fixtures, like mirrors or shower doors, are installed.

Step 5. Final inspection and clean

With everything installed and dry, your bathroom renovator will carry out a final inspection. They’ll clear away and dispose of any bits leftover by the tradies. Your contractor might complete a basic clean, but you might also want to book a renovation cleaning service so your new bathroom is absolutely spick and span.

Recent Bathroom Renovation tasks in North East Melbourne

Small bathroom renovation in macleod january

$3,000

Macleod VIC, Australia

6th Dec 2024

We have a 1.8x3m bathroom (excluding european laundry to be retained) that needs to be gutted and reinstated. Waterproofing around glazed panel failed and water coming up through tiles over extended period. Have had different trades in looking, had job booked for Jan that's fallen thro. Looking for contractor who can do in 2-3 weeks with reputable and good quality waterproofing system and excellent reviews. We will supply, quotes on labour please for two options - walk in shower and shower over bath. Quotes box doesn't allow over 9k, our budget is 30k.

Bathroom Fixtures/Vanity Upgrade & fix shower leaks

$1,000

Bundoora VIC 3083, Australia

6th Dec 2024

We are updating bathroom/toilet fixtures in the house. We need to replace 1 compact freestanding vanity to same size wall hung vanity, one freestanding basin to a floating countertop timber bench with basin(size checked on both). Two shower heads replace with taps. Replace two close coupled p trap toilets and if you can fix minor shower leaks from the corner base outside of the shower. Works to be undertaken early next month. All fixtures and fittings I will provide except for the minor consumables that go with work. Thanks

Bathroom renovation in Bundoora

$5

Bundoora VIC 3083, Australia

21st Nov 2024

Looking for a local tradie close to Bundoora. I want to add one toilet and one shower to the laundry. The area is 3.9mx2.1m. house is on concrete. Work needs to be done in 2 to 3 weeks.

He didn't take the job but provide good insights

Bathroom renovation

$7,000

Eaglemont VIC, Australia

5th Oct 2024

Require bathtub removal & new shower cubicle installed, bidet installation, possibly install new floor tiles.

Bathroom renovation

$5,000

Thomastown VIC 3074, Australia

3rd Oct 2024

Small bathroom including shower, bath and vanity. Plans are ready. Needs to be signed off by someone with a licence. I can lend assistance when required if a second person is needed.

Bathroom renovation

$2,000

Wallan VIC, Australia

16th Sep 2024

We would like to remove the shower cubical and add hand rails and curtains . First photo is how the bathroom is at the moment , second photo is how we would like it to be . No wood required as the walls have tiles .

Christopher was very professional and did an immaculate job. Very satisfied . Would highly recommend.

Bathroom Reno

$20

Whittlesea VIC, Australia

14th Sep 2024

Vanity pipe setup and puddle flange install

Extremely helpful, thank you Paul!

Bathroom reno

$250

South Morang VIC 3752, Australia

24th Aug 2024

Remove old mirror and install new mirror Plaster walls Remove shower screen Cut out tile and replace with tiles provided Reinstall shower screen Seal shower screen Grout shower tiling

Bathroom renovation

$5

Preston VIC, Australia

8th Jul 2024

Quote required to renovate bathroom. Bath and vanity removed. Ceiling replaced. New shower, toilet and vanity. Budget is $20K

Very friendly and nothing was too much trouble. Will definitely use again. Highly recommended.

Bathroom Reno reservoir

$1,000

Reservoir VIC, Australia

3rd May 2024

The tiles are old and need replacing, I also want to replace shower and new vanity cabinet.

New bathroom reno

$2,500

Wallan VIC, Australia

29th Apr 2024

We are builders doing a home reno for a client. Full bathroom gut/strip and redo. Roll over sewer pipe for new toilet location. Install new shower hose/rail, new vanity. Provide all rough-in and fitoff and certificate of compliance at completion.

Electrical bathroom reno

$750

Wallan VIC, Australia

29th Apr 2024

Bathroom mod in Beveridge (5min from Wallan). Supply and install new IXL heat/fan/light, new Double GPO at vanity, new GPO for Bidet

Bathroom Fixes

$200

Thomastown VIC, Australia

21st Apr 2024

Bathroom shower tap needs to be tightened due to leaking when on. Tap also to be fixed as currently not working

Amazing job, went above and beyond

Bathroom renovation

$5

North Warrandyte VIC 3113, Australia

12th Apr 2024

Bathroom renovation. Plumber, tiler, electrician. Possible stud wall to be built depending on cost.

Bathroom renovation

$9,999

Cazaly Ward VIC, Australia

8th Apr 2024

Renovation of small bathroom. We have drawings/design. Need someone to manage the few trades or do it themselves. Gut existing bathroom New vanity Add toilet Ground level walk in shower Tiling

Bathroom reno

$4,000

Reservoir VIC, Australia

10th Mar 2024

Full reno - fixtures covered by myself, construction materials needed to be provided.

Bathroom renovation and flooring. Carpet installation.

$500

Bundoora VIC, Australia

20th Feb 2024

Bathroom renovation - changing of tiles and shower screen

Tiler bathroom renovation interior render

$1,000

Eltham North VIC, Australia

20th Feb 2024

We are interested in getting someone to do microment or polished concrete, (cement overlay on tiles) like rendering but interior walls Walls are 3 meter high 3 meters square We’d like 2 walls done and the floor. WE have a small powere room we’d like the floor and walls covered in this cement mix

Bathroom Reno

$5

Preston VIC, Australia

15th Jan 2024

Small bathroom, roughly 2 x 3 metres. Please place an offer for this job. Need water proofing, shower and base installed, installation of new toilet, new basin, paint walls, new toilet and tapware. Tiling of the walls (halfway) and caulking. I will provide the tiles, shower screen, toilet, shower base, wall paint and tapware separately. - Due date: Before Wednesday, 20 March 2024

Bathroom renovation

$3,000

Viewbank VIC, Australia

23rd Dec 2023

Need to build a shower in my laundry room. Images attached for reference. - Due date: Flexible